Acrow bridge comes into operation at Nuwakot’s Devighat (Pictures)
Summary
An Acrow bridge has come into operation over the Tadi River at Devighat in Nuwakot after the existing concrete bridge was swept away by floods. Built by the Nepal Army in five days, the bridge is now open to all types of vehicles.
Key Points
- The Nepal Army completed and opened an Acrow bridge over the Tadi River at Devighat, Nuwakot.
- The bridge was built after the earlier concrete bridge was washed away by floods in the Bhotekoshi and Trishuli rivers.
- Lieutenant General Ranjit Thapa said 55 technical personnel worked around the clock to finish the 57.9-meter bridge in five days.
- The bridge connects Bidur of Nuwakot with Galchhi and has been open to all vehicles since Thursday evening.