Mahesh-Dhapung-Tarakhola Road Construction Completed in Myagdi

Summary

The Mahesh-Dhapung-Tarakhola road construction in Myagdi has been completed with a 3.5-kilometer paved and graveled stretch, drainage systems, and retaining walls added.

Key Points
  • The construction of the Mahesh-Dhapung-Tarakhola road has been completed.
  • A 3.5-kilometer stretch from Pakher in Mangala Rural Municipality-3 to Aaldanda has been paved and graveled.
  • Rs 58.6 million was spent on upgrading the road.
  • The road now includes drainage systems and retaining walls to prevent erosion.
Article image