Traffic along BP highway resumes after three days
Summary
Traffic along BP highway in Kavrepalanchowk has resumed after three days of blockage caused by landslides and floods following heavy rainfall.
Key Points
- Traffic along BP highway resumed after three days of blockage caused by landslides and floods.
- Landslides occurred at multiple locations on the Chaukidanda-Nepalthok section of the highway.
- A 50-meter road diversion was constructed at Roshi rural municipality-8 to restore traffic.
- Incessant rainfall from October 30 led to the landslides that obstructed the highway.