Road linking Ghyaasikhark and Lulang reopens after four-month

Summary

The road linking Ghyaasikhark and Lulang in Myagdi has reopened after four months of blockage caused by landslides and rising water levels during the monsoon season.

Key Points
  • The transportation route between Ghyaasikhark and Lulang has resumed operations after being closed for four months due to landslides and flooding.
  • A landslide in Malang and rising water levels in Darakhol blocked access since June.
  • Installation of a hump pipe and cessation of rains have allowed transport to resume.
  • Road clearing was aided by local hydropower projects, restoring access and facilitating travel and trade in the area.
Article image