Joshi Hydropower Development Company Halts Operations Following Flood Damage
Summary
Joshi Hydropower Development Company has halted operations at its Upper Puwa-1 Hydropower Project due to flood damage caused by heavy rainfall, with restoration efforts planned once conditions stabilize.
Key Points
- Joshi Hydropower Development Company suspended electricity production at Upper Puwa-1 Hydropower Project after flood damage.
- Heavy rainfall caused flooding and damage to multiple structures in the project’s headworks area.
- Continuous high water levels in Puwa Khola have delayed detailed damage assessment.
- Restoration efforts will begin once conditions stabilize and further information will be shared later.