Temporary road being constructed on damaged BP Highway
Summary
Work on a temporary road diversion along the damaged BP Highway has resumed in Kavrepalanchok and Sindhuli following floods and landslides caused by the Roshi River.
Key Points
- Floods and landslides caused by the Roshi River damaged sections of the BP Highway on October 4 and 5.
- The Division Road Office, in collaboration with local municipalities, has started reconstructing temporary road diversions.
- Temporary road construction is underway at multiple locations including Chaukidanda in Kavrepalanchok and Nepalthok in Sindhuli.
- Alternative routes via Khurkot–Manthali and the Araniko Highway are currently used as the BP Highway remains blocked.