Pontoon bridge installed across Trishuli river at Furke Khola
Summary
A temporary pontoon bridge from Bardiya has been installed across the Trishuli river at Furke Khola in Dhading, restoring a vital road link disrupted by floods nearly three months ago. The bridge will open to traffic after technical tests, while residents continue to demand a permanent replacement.
Key Points
- A temporary pontoon bridge transported from Bardiya has been installed across the Trishuli river at Furke Khola in Dhading after floods destroyed the permanent crossing.
- The bridge is expected to open to traffic on Tuesday after load-capacity and technical tests, with only light vehicles and emergency services allowed at first.
- All 13 local units in Dhading pooled resources to retrieve, transport and install the unused bridge, with costs estimated at around Rs6 million.
- The washed-away bridge had cut access to the Prithvi Highway, forcing long detours, raising transport costs and disrupting medical and goods transport.