Pontoon bridge installed across Trishuli river at Furke Khola

Summary

A temporary pontoon bridge from Bardiya has been installed across the Trishuli river at Furke Khola in Dhading, restoring a vital road link disrupted by floods nearly three months ago. The bridge will open to traffic after technical tests, while residents continue to demand a permanent replacement.

Key Points
  • A temporary pontoon bridge transported from Bardiya has been installed across the Trishuli river at Furke Khola in Dhading after floods destroyed the permanent crossing.
  • The bridge is expected to open to traffic on Tuesday after load-capacity and technical tests, with only light vehicles and emergency services allowed at first.
  • All 13 local units in Dhading pooled resources to retrieve, transport and install the unused bridge, with costs estimated at around Rs6 million.
  • The washed-away bridge had cut access to the Prithvi Highway, forcing long detours, raising transport costs and disrupting medical and goods transport.
Article image