Narayan-Mugling Road Section to Close Daily for Landslide Prevention Work

Summary

The Narayan-Mugling road section in Chitwan will be closed daily for five hours as authorities resume landslide prevention work at Tuiin Khola. The road will remain shut from 11 AM to 4 PM until further notice, with officials using nailing, horizontal drains, and bioengineering to stabilize the slope.

Key Points
  • The District Administration Office, Chitwan, will close the Narayan-Mugling road section daily from 11 AM to 4 PM for landslide prevention work.
  • The Road Division Office, Bharatpur, will use nailing, horizontal drains and bioengineering to stabilize the Tuiin Khola slope.
  • Officials said the work is being resumed after being halted since last October and may require at least 15 days of closure.
  • The Prithvi Highway route from Kathmandu via Mugling-Anbu Khaireni to Pokhara will remain open during the closure period.
Article image