Kathmandu biogas plant resumes trial operations to turn waste into energy
Summary
Kathmandu Metropolitan City has restarted the Teku biogas plant on a trial basis to turn organic waste into electricity and reduce methane emissions from landfill sites. The upgraded facility can process three tonnes of waste a day and generate up to 14 kilowatts of power.
Key Points
- Kathmandu Metropolitan City has resumed trial operations of the Teku biogas plant after technical upgrades costing about Rs 18 million.
- The plant can process three tonnes of organic waste daily and generate up to 14 kilowatts of electricity, with output usable for power, cooking and vehicle fuel.
- Energy Minister Biraj Bhakta Shrestha and Acting Mayor Sunita Dangol reopened the facility with support from the Alternative Energy Promotion Centre and the World Bank.
- Officials say the project will help cut landfill methane emissions and serve as a demonstration centre for zero-waste practices.