Nyalu road reopens after two months
Summary
The Nyalu Pass section of the Limi-Lapcha road in Humla has reopened after two months of closure caused by heavy snowfall. The route is still hazardous, but the clearing allows vehicles to reach Limi again and opens the way for subsidised food deliveries.
Key Points
- The Nyalu Pass section of the Limi-Lapcha road in Namkha Rural Municipality-6, Humla, reopened after two months of blockage from heavy snowfall.
- Workers cleared three to four feet of snow with excavators and backhoe loaders despite repeated snowfall and difficult conditions.
- Following the reopening, 10 Bolero jeeps reached Limi and vehicle movement resumed, though driving remains hazardous because of ice and strong winds.
- The reopening will allow subsidised food supplies from Food Management and Trading Company Limited to reach Limi, after a year without deliveries.