Nepal, India agree to expedite finalization of Pancheshwar Multipurpose DPR

Summary

Nepal and India have agreed to expedite the finalization of the Detailed Project Report for the long-delayed Pancheshwar Multipurpose Project and to speed up work on the Saptakoshi and Sunkoshi projects. The two sides also virtually laid the foundation stone for the 669 MW Lower Arun Hydro-Electric Project.

Key Points
  • Prime Minister Balen Shah and Indian Prime Minister Narendra Modi directed the Pancheshwar Development Authority and the Joint Committee on Water Resources to finalize the Pancheshwar DPR quickly.
  • Both sides agreed to accelerate DPR work on the Saptakoshi and Sunkoshi multipurpose projects to support water-use benefits and flood mitigation.
  • The Pancheshwar project on the Mahakali River has been stalled for decades over cost-sharing and benefit-sharing issues.
  • Nepal and India also virtually laid the foundation stone for the 669 MW Lower Arun Hydro-Electric Project.