Nepal and India PMs inaugurate 669MW Lower Arun project

Summary

Nepal and India’s prime ministers jointly laid the foundation stone for the 669MW Lower Arun Hydropower Project, moving the long-delayed scheme closer to construction. The project will cost Rs92.67 billion and generate power through a tunnel linked to the Arun-3 project.

Key Points
  • Prime Minister Balendra Shah and Indian Prime Minister Narendra Modi jointly inaugurated the 669MW Lower Arun Hydropower Project virtually from New Delhi.
  • The project is estimated to cost Rs92.67 billion and will use discharged water from the 900MW Arun-3 project through a 17.4-kilometre tunnel.
  • SJVN Lower Arun Power Development Company, a subsidiary of India’s state-owned SJVN, is developing the project and has already awarded major construction packages.
  • The Investment Board Nepal says the project has moved into the construction phase, though financial closure is still pending.
Article image