Breakthrough made in 3,422-metre tunnel

Summary

The Mahadevtar Tunnel on the Kathmandu–Tarai/Madhes Fast Track has achieved a breakthrough, marking a major milestone in Nepal’s flagship infrastructure project. President Ramchandra Paudel praised the Nepali Army’s progress, while the government warned contractors to speed up delayed work.

Key Points
  • The 3,422-metre Mahadevtar Tunnel broke through on Wednesday in the presence of President Ramchandra Paudel.
  • The tunnel is part of the Kathmandu–Tarai/Madhes Fast Track, where the Nepali Army says overall physical progress has reached 51 per cent.
  • Minister for Infrastructure Development Sunil Lamsal warned that underperforming contractors could face termination if revised schedules are not met.
  • The project aims to improve transport links, cut travel time and costs, and boost trade, tourism and regional development.
Article image