18 flood-damaged suspension bridges resume operation after repairs
Summary
Eighteen flood-damaged suspension bridges along the Bhotekoshi-Trishuli River corridor have resumed operation after repairs. The work cost around Rs 55 million, according to the Suspension Bridge Division Office.
Key Points
- Eighteen suspension bridges damaged by floods along the Bhotekoshi-Trishuli River corridor are back in operation after repairs.
- The Suspension Bridge Division Office said the bridges were repaired under the Department of Local Infrastructure Development.
- Around Rs 55 million was spent on repairing the bridges, according to planning chief Shanker Budhathoki.