Road restoration works gain pace

Summary

Flood and landslide damage has disrupted major highways across Gandaki, Bagmati and other provinces, prompting emergency repairs ahead of Dashain travel. The Beni-Jomsom, Prithvi, BP and Galchhi-Syabrubesi routes have partially reopened, while work continues on bridges and damaged stretches to restore connectivity.

Key Points
  • The government has intensified repairs on flood- and landslide-hit roads and highways ahead of Dashain to keep passenger and goods movement flowing.
  • The Prithvi Highway, BP Highway and Galchhi-Syabrubesi road have partially resumed operation after temporary restoration work.
  • A flood in the Budhigandaki River damaged a bridge between Arughat and Dhading, and the Nepali Army is preparing to install a Bailey bridge.
  • Authorities have warned travellers to check road conditions and remain cautious on vulnerable stretches as delays and congestion continue.
Article image