Track opened on flood-damaged Galchhi–Betrawati road
Summary
A track has been opened on the flood-damaged Galchhi–Betrawati road in Rasuwa, restoring movement for public transport and other vehicles. Work to level the road, lay gravel and install a Bailey bridge is continuing, with completion targeted within a week.
Key Points
- A track has been opened on the flood-damaged Galchhi–Betrawati road section in Rasuwa, allowing vehicles to resume movement.
- Minister for Infrastructure Development Sunil Lamsal said road levelling and gravel work still remain incomplete.
- Preparations to install a Bailey bridge are underway on both the Nuwakot and Rasuwa sides, with army support.
- Travel to and from Rasuwa had been disrupted after floods damaged the road infrastructure.