Besishahar-Chame Road Blocked by Landslide

Summary

The Besishahar-Chame road has been completely blocked after a landslide at Kharkhare cliff in Besisahar Municipality-6, with part of the road sinking about 200 meters north of the site. Continuous rain is making clearance and repair difficult.

Key Points
  • The Besishahar-Chame road was completely blocked after a landslide at Kharkhare cliff in Besisahar Municipality-6.
  • The road has sunk about 200 meters north of the landslide site.
  • Continuous rain is hampering efforts to clear the landslide and repair the damaged section.
Article image