Flood Damages Roads and Bridges in Rasuwa, Nuwakot, and Dhading

Summary

The severe flood in Bhote Koshi has damaged roads and bridges in Rasuwa, Nuwakot, Dhading, and Gorkha, leaving locals dependent on temporary crossings and alternate routes. The disaster has disrupted transport of food, patients, and students, while repair work and Bailey bridge construction continue.

Key Points
  • The Bhote Koshi flood has damaged 37 motorable bridges and 68 suspension bridges across Rasuwa, Nuwakot, Dhading, and Gorkha.
  • A month after the flood, road connectivity has not been restored and locals are still using temporary crossings and pulley systems over the Trishuli.
  • The disaster has affected transport of food grains, patient access to health institutions, and students’ commute to school.
  • The Department of Roads and the Nepali Army are working to build Bailey bridges and open tracks in some areas.
Article image