Repair of 12 flood-damaged suspension bridges begins

Summary

The government has started repairing 12 flood-damaged suspension bridges in Dhading, Nuwakot and Gorkha. A tender has also been issued for rebuilding 33 bridges that were completely destroyed.

Key Points
  • Repair work has begun on 12 suspension bridges damaged in flood-affected areas.
  • The bridges are located in Dhading, including links connecting Nuwakot and Dhading, and the Badare bridge connecting Gorkha and Dhading.
  • The Ministry of Infrastructure Development says it is working to restore the bridges to operation soon.
  • A tender was announced for the reconstruction of 33 suspension bridges that were completely destroyed.
Article image