Nepal Prepares for Winter Load Shedding Prevention with Indian Power Imports

Summary

Nepal Electricity Authority has prepared to manage winter power demand by importing up to 654 megawatts from India after flood damage disrupted hydropower projects. Officials say there will be no nationwide load shedding, while India has approved limited-hour electricity imports until January 1.

Key Points
  • The Nepal Electricity Authority says it is preparing for winter electricity management after Bhote Koshi flood damage affected 13 hydropower projects.
  • India has approved Nepal to import 654 megawatts of electricity, including 600 MW through the Dhalkebar-Muzaffarpur line and 54 MW through the Tonaakpur-Mahendranagar line.
  • Acting executive director Dirghayu Shrestha said Nepal is also seeking an additional 150 MW import in round-the-clock mode for easier dry-season management.
  • Former energy minister Kulman Ghising said load shedding will not return, arguing that Nepal’s current generation capacity and imports are sufficient.
Article image