Temporary footbridge, ‘tuin’ installed to restore access in Rasuwa

Summary

Temporary bridges have been installed over the Phalakhu and Bhotekoshi rivers on the Rasuwa-Nuwakot road after floods destroyed concrete crossings and cut road connectivity. A bamboo bridge at Betrawati and an iron-wire cable ‘tuin’ at Syabrubesi are restoring access for local residents in northern Rasuwa.

Key Points
  • Floods destroyed concrete bridges over the Phalakhu and Bhotekoshi rivers on the Rasuwa-Nuwakot road section, disrupting connectivity.
  • A bamboo-and-wood pedestrian bridge has been built at Betrawati, and a ‘tuin’ cable bridge has been installed at Syabrubesi.
  • The temporary crossings are easing travel for residents of several settlements in northern Rasuwa.
  • Work is still underway to complete the footpaths on both sides of the Syabrubesi tuin.
Article image