Nepali Army Prioritizes Rescue of Those Trapped in Bhote Koshi Flood-Affected Hydropower Projects

Summary

The Nepali Army is prioritizing rescue operations for people trapped in tunnels and powerhouses of hydropower projects affected by the Bhote Koshi flood. Four bodies have been recovered from Upper Trishuli-1, while search and cleanup efforts continue at Trishuli-3B and Chilime.

Key Points
  • The Nepali Army is focusing rescue efforts on people trapped in hydropower tunnels and powerhouses after the Bhote Koshi flood.
  • An access road of more than one kilometer was built from Syabrubesi in Rasuwa to reach the Chilime Hydropower Project tunnel.
  • Four bodies have been recovered so far from Upper Trishuli-1.
  • Rescue operations are continuing at Trishuli-3B and Chilime, with Nepali and Indian rescuers working together at Chilime.
Article image