Prithivi Highway Affected by Trisuli River Erosion, Traffic Disrupted
Summary
Floods in Rasuwa have eroded sections of the Prithivi Highway, triggering landslides and subsidence that have halted traffic between Kathmandu and the western regions. The Road Department is repairing damaged stretches and urging travelers and cargo vehicles to use alternative routes.
Key Points
- Flood-driven erosion by the Trisuli River has damaged multiple sections of the Prithivi Highway and stopped traffic on the route.
- About 120 meters at Krishnabhir and 100 meters at Parevabir have been eroded, with additional damage in Chhahare-Chalishe and near the Nagdhunga checkpoint.
- The Road Department is building an alternative road and carrying out graveling and repairs to restore movement, including for large cargo vehicles.
- Alternative routes through BP Highway, Kanti Lokpath, Tribhuvan Rajpath and other connecting roads have been advised for stranded passengers and vehicles.