Power Supply Restored in Flood Hit Areas of Nuwakot
Summary
The Nepal Electricity Authority has restored electricity in several flood-affected areas of Nuwakot after the Bhotekoshi River flood disrupted regular supply. Alternative lines from Sindhupalchok and Dhading are being used while damaged infrastructure is repaired.
Key Points
- Electricity has been restored in several flood-hit areas of Nuwakot through an alternative supply route from Sindhupalchok.
- The NEA is working to repair damaged lines and expects to bring additional areas back online by this evening.
- Some parts of the Trishuli area are receiving power through the Salayantar substation in Dhading.
- Energy, Water Resources and Irrigation Minister Biraj Bhakta Shrestha instructed authorities to speed up rescue and restoration efforts.