Muglin-Narayangadh Road Section Reopens After Landslide Clearance
Summary
The Muglin-Narayangadh road section in Chitwan has reopened in both directions after a landslide near Muglin bazaar was cleared. Vehicles are now plying from both sides after the Road Division Bharatpur removed the blockage.
Key Points
- The Muglin-Narayangadh road section was closed on one side after a landslide near Muglin bazaar this morning.
- The Road Division Bharatpur cleared the debris using its equipment.
- The road was fully opened from 10:35 AM and traffic has resumed in both directions.