Muglin-Narayangadh Road Section Reopens After Dry Landslide
Summary
The Muglin-Narayangadh road section in Chitwan has reopened after being blocked by a dry landslide at Tuin Khola. Traffic resumed following clearance of debris, with caution advised due to possible further landslides.
Key Points
- A dry landslide at Tuin Khola blocked the Muglin-Narayangadh road section.
- The Road Division, Bharatpur cleared the debris and reopened the road by 11:15 AM on Wednesday.
- Drivers have been urged to follow lanes and travel cautiously.
- There is a possibility of further landslides in the reopened area, necessitating caution.