Traffic halted on Butwal-Narayangadh road due to heavy rain
Summary
Heavy rain has blocked the Butwal-Narayangadh road at the Daunne section in Nawalparasi due to mud and slippery conditions, causing traffic disruption.
Key Points
- Transportation services on the Butwal-Narayangadh road are obstructed due to heavy rainfall.
- The Daunne section in Binayi Triveni Rural Municipality-2 is completely blocked because of mud and slippery road conditions.
- Vehicles are stuck near Ghiukhola and Bishwokarma Temple causing traffic congestion.
- Efforts are underway to repair the road by laying gravel as the construction on the Daunne section is incomplete.