Super Khudi Hydropower Limited IPO Allotment Concludes: Lucky 1,28,650 Applicants Allotted 10 Units Each via Lottery System
Summary
Super Khudi Hydropower Limited concluded its IPO allotment, with 1,28,650 applicants allotted 10 units each through a lottery system. The hydropower project is located in Lamjung District.
Key Points
- Super Khudi Hydropower Limited concluded its IPO allotment with 1,28,650 applicants allotted 10 units each via a lottery system.
- The company issued 12,86,500 units to the general public as part of its IPO.
- The issuer rating of Super Khudi Hydropower Limited was reaffirmed as CARE-NP BB (Is) by CARE Ratings Nepal Limited.
- The hydropower project is a 26 MW run-of-river plant located in Marshyangdi Rural Municipality, Lamjung District, constructed under the BOOT model.